Renovation Pre-wire & Infrastructure

The best time to design your technology is before the walls are closed. We provide professional pre-wire and infrastructure planning for UAE renovations.

Not sure what to plan before renovations?

Start with cabling standards, cabinet layouts, and pre-wire checklists to avoid expensive rework.

Choose Your Planning Focus

From early-stage design to final fix and handover.

Structured Cabling

Cat6/Cat6A planning, termination, and testing for reliable backhaul.

  • Access point and camera drops
  • Labeling and testing
  • Clean cable routes
Cabling standards

Network Cabinets & Racks

Clean equipment layouts that keep systems serviceable and tidy.

  • Rack design and ventilation
  • Patch panel termination
  • UPS and power planning
Network cabinets

Renovation Pre-wire

Plan cable runs early to avoid rework after walls close.

  • Room-by-room cabling plan
  • Contractor coordination
  • Future-proofing
Pre-wire checklist

Planning Packages

Clear guidance based on your renovation scope and build stage.

Pre-wire Review

From AED 1,500

Quick review of cabling plans to avoid common mistakes.

  • On-site walkthrough
  • Cable plan review
  • Priority fixes list
  • Follow-up notes
Request a quote

Full Low-voltage Design

Project dependent

Room-by-room cabling plan with cabinet layout and system notes.

  • Cabling plan + drawings
  • Cabinet layout
  • Equipment schedule
  • Contractor notes
Request a quote

New Build Coordination

Project dependent

Ongoing coordination with contractors and staged inspections.

  • Site inspections
  • Cable route sign-off
  • As-built documentation
  • Handover support
Request a quote

Our Renovation Process

A structured approach to ensure your technology is integrated correctly.

1

Site Review

We assess the property, renovation plans, and technology goals.

2

Design & Drawings

Detailed cabling routes, cabinet layouts, and equipment placement.

3

Implementation

We coordinate with contractors and verify installation quality.

4

Testing & Documentation

Termination testing, labeling, and handover documentation.

Need Help Fixing Messy Cabling?

We can assess existing wiring and recommend upgrades that improve reliability

Common Questions

When should I involve a low-voltage consultant in my renovation?

As early as possible—ideally during initial design, before walls are closed. This allows us to plan cable routes, specify conduit sizes, and coordinate with your contractor. Engaging late often means compromise on cable routes or expensive rework.

What is structured cabling and why does it matter?

Structured cabling is a standardized approach to low-voltage wiring using Cat6/Cat6A cables from a central location to each room. It provides reliable, high-speed connections for WiFi access points, security cameras, and AV equipment—far more stable than relying on wireless alone.

Do you work with contractors and interior designers?

Yes. We coordinate with builders, electricians, MEP consultants, and interior designers to align infrastructure plans. We provide cabling drawings, conduit specifications, and attend site meetings to ensure correct implementation.

Can you reuse existing cabling from a previous installation?

We assess existing wiring and reuse it if it meets performance and quality requirements. Cat5e or older cabling may limit future upgrades. We test cables and provide honest recommendations on what can be retained.

What cables should be installed during a villa renovation?

At minimum: Cat6A to each room for WiFi access points, to camera locations, and to AV equipment positions. Speaker cables if planning ceiling audio. Coax or fiber for specific AV needs. We provide a room-by-room schedule during design.

Where should the network cabinet be located?

Ideally in a ventilated utility room, store, or garage with power and climate control. Avoid locations that overheat. The cabinet should be accessible for maintenance but not in living spaces where noise or aesthetics matter.

Do you provide drawings for contractors?

Yes. We provide cabling schedules showing cable types and quantities per room, floor plans marking outlet locations, rack layouts, and written specifications. These integrate with your contractor's documentation.

What happens if cabling is installed incorrectly?

Incorrect cabling can cause slow speeds, dropouts, or complete failure. Common issues include wrong cable types, poor terminations, cables run alongside power, or missing cables entirely. We offer staged inspections to catch problems before walls close.

How much does pre-wire planning cost?

A pre-wire review with site visit and recommendations starts from AED 1,500. Full low-voltage design with drawings and specifications is project-dependent based on property size and complexity. The cost is typically offset by avoiding rework.

Can you help with a new build, not just renovations?

Yes. New builds are ideal because infrastructure can be planned from scratch. We engage during architectural design to specify conduit routes, cable schedules, and equipment locations before construction begins.

Plan Infrastructure Early

Request a consultation to align cabling, cabinets, and WiFi coverage before walls close